17 October 2026 / Caryne & Dwayne Team
Most waterproofing problems start before the first coat. A little time spent on the surface avoids much of the trouble later.
A short checklist
- Clean: remove dust, oil, laitance and loose material.
- Sound: repair cracks, honeycombing and damaged edges with a suitable repair mortar.
- Falls: check that water will run to the drains and not collect in pools.
- Moisture: confirm the substrate meets the moisture requirement on the product data sheet.
- Details: plan upstands, drains, pipes and joints before application begins.
- Primer: apply the primer recommended for the substrate and product.
Always follow the manufacturer's data sheet for the product you are using, and keep a record of conditions on the day of application.
Our team can advise on preparation for your project. Get in touch through the contact page.
Planning a project?
Request a Quote