Caryne & Dwayne

Article

Before you waterproof: preparing the surface

17 October 2026 / Caryne & Dwayne Team

Before you waterproof: preparing the surface

Most waterproofing problems start before the first coat. A little time spent on the surface avoids much of the trouble later.

A short checklist

  • Clean: remove dust, oil, laitance and loose material.
  • Sound: repair cracks, honeycombing and damaged edges with a suitable repair mortar.
  • Falls: check that water will run to the drains and not collect in pools.
  • Moisture: confirm the substrate meets the moisture requirement on the product data sheet.
  • Details: plan upstands, drains, pipes and joints before application begins.
  • Primer: apply the primer recommended for the substrate and product.

Always follow the manufacturer's data sheet for the product you are using, and keep a record of conditions on the day of application.

Our team can advise on preparation for your project. Get in touch through the contact page.

Planning a project?

Request a Quote